One of the team members and me working on the fence

Are you tired of reading updates where nothing has changed? WELL, then today is your lucky day. Things are happening! My gosh, and it’s such chaos that part of me wishes FEWER things were happening, but isn’t that always the way these things go? There’s nothing nothing nothing and then EVERYTHING hits at once.

I’ll start off with the words I’m sure you thought you’d never hear… construction started!!! We had the first workers onsite two and a half weeks ago, and things really got going about 4 days in when they brought the front-end loader back onsite to dig the foundation holes. That was also the day when our next mission team arrived, 15 people from ACF, one of the Christian campus ministry groups at Penn State.

The site with construction materials organized
The site back when it still looked remotely organized. The wooden formwork for the concrete is in the background, the concrete mixer is to the left, and the steel rebar for reinforcing the concrete is under the blue tarp.

If that sounds like a lot happening at once, just wait. To say that construction got off to a rough start would be the understatement of the century. In ONE day while they were digging the foundation holes, they cut FOUR tubes that were not supposed to be cut. Four tubes that were in known locations. It’s so sad that it’s almost comical, but at the same time, it’s not funny at all because that kind of thing should not be happening. The water lines to the two back buildings were cut, plus the electrical ground line to one and ALL of the electrical power to the other. So besides being a bit stupid, it also had the potential to be dangerous. Thankfully, no one was electrocuted, the water lines were quickly repaired (though then there was dirt in the lines which clogged up the plumbing fixtures. So, all of the toilets ran constantly after the first flush until they went through the property’s entire water supply. A water truck came to refill our water tanks, and the toilets were shut off and bucket flushed until the dirt could be cleaned out. Fun, right?), and the electricity was restored a few days later when we luckily already had the electrician scheduled to come.

The front-end loader getting ready for another go at the hole
The front-end loader digging out one of the foundation holes. This was pre-pipe breaking.
A large hole in the ground
The second foundation hole
A giant pile of dirt from the foundation holes
Our lovely dirt pile. The grounds are looking a bit rough at the moment…

Thankfully, since then, there have been fewer… mishaps… with the construction, though every day still does seem to have its share of crises. They poured the concrete for the foundations on one side of the building on Friday, and now they’re working on setting up the steel for the foundations and columns on the other side. Seeing the columns sticking up makes it easier to imagine a building there, and it’s insane. This building is going to be huge compared to the existing buildings because it’s going to have a whole extra story! I don’t think anyone really understands how massive it’s going to look.

The beginnings of the foundations
On side #1, they started by assembling the steel for the foundations and attaching the columns. You can also see the wooden formwork starting to go in to contain the concrete when it gets poured later.
The building progressing
More steel, more formwork, and the world’s most terrifying scaffolding.
Most of the rebar and formwork for the foundations on side #1
Almost ready for concrete!
Concrete pour in progress
The concrete was poured on Friday, and it was an all-day event. They had extra guys working, and it was nonstop mixing and dumping wheelbarrow after wheelbarrow of concrete into the foundations. The guy at the bottom is using this tool that vibrates to help the concrete settle and eliminate air pockets.
Concrete foundations poured!
The end result
The concrete mixer, piles of materials, and crew
The mixing crew. Gravel, sand, concrete, water, repeat.

The construction alone is enough to make life here crazy, but that’s not all that’s been going on. Like I said, we had FIFTEEN additional people on the property for the last week and a half. I didn’t think the number sounded like a lot until I saw it in human form. Trust me, it’s a lot. Especially when they all need to be managed and directed. They mainly worked on three projects: 1. Digging a trench to put in a new septic line (at the deepest point, it had to be something like 2 meters deep), 2. Finishing the drywall and painting the bathroom/break room for the construction workers, and 3. Building a new bamboo fence near the soccer court.

My major job while they were here was managing projects #2 and #3. You ask, “What do you know about drywall, Lara?” WELL, I watched a very informative 2-hour-and-15-minute video about drywall installation, so I’m basically an expert now (I can send you the link if you’re interested. It’s truly thrilling. Strongly recommend watching it at 1.75 speed). You ask, “What do you know about bamboo construction, Lara?” WELL, um… nothing. You know that saying “Fake it ‘til you make it”? Story of my life right now. It’s the same strategy as when I’m in an unfamiliar city and don’t know what direction I need to walk… so, I take a guess and march confidently in that direction until I get my bearings. And then I turn around and march confidently in the opposite direction.

Debbie and the two bamboo guys looking for the perfect bamboo
Debbie picking out bamboo from the bamboo store for our fresh bamboo fence… because obviously there are bamboo stores because where else would you go to buy bamboo?
Bamboo standing on end at the bamboo store
Bamboo forest
The delivery truck loaded up with bamboo
Our bamboo delivery vehicle.

Debbie did go over the general processes before releasing me into the wild, but as clear as everything seemed when it was being explained, it was a whole different story when we got to the actual execution. I had a lot of follow-up questions.

How did it all turn out? Surprisingly well, actually. The drywall/painting project is finished and looks better than I expected, honestly. There are definitely some parts that are a little rough, but it’s a utility space which means that’s not a huge deal. It’s just going to get banged and dirtied up anyway. The most important thing is that it’s finished, so the construction workers can actually start using it for their break room/changing area instead of the little closet they’ve been crowding into.

Mudding over the joints to get ready for painting
Some of the drywall/painting crew, hard at work.

The bamboo fence is still a work in progress, and I’m very optimistic about how it’s going to turn out. So far, we have all of the pieces prepared (they had to be cleaned, cut, sanded, painted with insecticide, and varnished), and the columns are in place. At least half of them are properly aligned which is promising. The other half was just installed, so we haven’t checked the fit of the horizontal beams yet. Fingers crossed! Hopefully the next team (which is already here. They came in last night!) can finish it off this week.

Bamboo laying out to dry
The treated and varnished bamboo for the fence
One of the team members and me working on the fence
Working on the columns for the fence with one of the team members (Pic by the EA photographer, David)
Me and a team member tying caution tape around our fence-in-progress
Putting up a worthless caution-tape barrier around our columns as their concrete footers set. The kids all proceeded to ignore the caution tape completely during recess. We basically had a human wall in front of the columns, trying to keep balls and kids from knocking them out of alignment before the concrete could harden enough to hold them in place. (Pic by David)

The septic trench is also not finished, though they did make amazing progress and even started to lay the pipe. The deepest part is finished, there’s a tunnel underneath the sidewalk, and the next segment is marked out and started. It’s crazy! They managed to make it so deep and skinny; it’s like a crack in the earth. They started having to reassign the shorter people on the team to other projects because the sides of the trench were getting too high for them.

Septic trench
The trench! It doesn’t look super deep in this picture, but the far end is at least 2m from top to bottom.
The trench and under-sidewalk tunnel
The tunnel under the sidewalk! So glad I wasn’t involved with the digging of that…
The team standing in their trench, holding digging tools
The team in the trench. I’m looking awkward on the far left. Also it looks like I have a double hand and super wide arm, but I promise I haven’t mutated in the last few months, so we’ll blame it on the picture.

The final craziness of the last few weeks is EARTHQUAKES! During the 10 days that the ACF team was here, there were THREE that we very clearly felt. The first happened on the team’s third day. We were at lunch, and it was super short but felt STRONG. In my head, it was like I was seeing through broken glass. Sharp and very pronounced. I don’t know how else to explain it.  There was no question in my mind that it was an earthquake, and the kids and staff were on the same page because we all stood up practically in unison to evacuate… except for the team. The teachers started grabbing little kids out of their chairs, and everyone started moving to the doors. I figured I should clue the team members in, you know, just in case the building was going to decide to fall down. I thought that they’d figure it out quickly once they saw me, but that was definitely not the case. It went something like:

“EARTHQUAKE!” At this point, I was yelling because it was loud but still very calm.

“What??”

“EARTHQUAKE!!” Starting to lose my calm…

“Huh?”

Jocelyn and me in front of a pile of mud bricks
Jocelyn and me at Huaca Pucllana, an archaeological site in Lima. We went with the team on their sightseeing day. That’s a giant pyramid of adobe bricks behind us!

“EARTHQUAKE! WE NEED TO LEAVE!” I signaled with my hands. I was ready to just leave them if this didn’t work. Finally, they got it and joined the crowd headed out to the soccer court. Geez, good thing the building didn’t fall down! No one on the team felt it, and I think they were a little skeptical that it even happened until enough other people confirmed it. Really though, why would I make up an earthquake??

The next one was the extra crazy one. It happened at 2:40AM last Sunday morning. I woke up VERY quickly, and when we were still shaking after like 10 seconds, Debbie and I got up to leave. She pounded on Jocelyn’s and Julie’s doors on the way out, and when we got downstairs, it was STILL going. Our “safe area” is in the dirt outside, and usually, once you get off the sidewalk, you can’t feel anything. Not this time! Even on the ground, we could absolutely feel the shaking, like a deep rumble underneath our feet.

It seemed to go on forever. In the quiet of the night, Julie’s cat meowed his distress from inside his crate. Our metal stairs “thunk, thunk, thunk”-ed against the building, and the steel for the new building’s columns clinked together like wind chimes in the distance. And all we could do was stand there and wait. It was eerie. In the morning, Debbie said that it lasted 2 whole minutes. Two eternities in earthquake time. It was an 8.0 magnitude earthquake about 500 miles away from us, at the edge of the Amazon, 70 miles below the surface. Whatttt?! I don’t think there was much damage, thankfully, because of the location, but you can bet that EVERYONE was talking about it the next day. What a weird thing. As someone who comes from a nearly earthquake-less area, the feeling of the ground shaking beneath me is insanely discomforting.

The EA family
The kids, teachers, team, and us. I’m sure it looks just like the picture from the last team that visited… and I’m wearing the same shirt but shhh. It’s different, I promise.

There have been a LOT of smaller earthquakes since then, way more than the usual (aftershocks maybe? I don’t know how these things work). Two nights later, there was another one strong enough to make us evacuate. Three in one week, and one an 8.0! What is happening!?

I know, this was quite the long update, but I suppose that’s what happens when things get busy and I don’t write for three weeks (oops). I’ll do better next time!

Full moon over the campus

This was quite the eventful week! Work-wise, it wasn’t much different than last week. I spent more time hunched over my computer and slightly less time pulling my hair out. At least that’s an improvement, right? I guess I should work on the hunching part next so that I don’t get stuck like that.

Anyway, the building plans are slowly, slowly coming along. I have a bunch of questions that need to be answered before I can put together a complete first draft, but at least there’s something on the page now! A tiny bit of progress is still progress.

Full moon over the campus
Moonlit night. Fair warning I forgot to take pictures this week (and there wasn’t much to take pictures of), so whatever your expectations are, lower them (and look forward to the many pictures that will be in my next Patagonia post).

The eventfulness of the week was more related to environmental factors. On Wednesday morning, I woke up early and noticed a weird glow coming from our living room… aliens! Kidding, it was our emergency light which meant the power was out. That was around 5:30AM. We’re not positive about when it went out, but Paul said he woke up around 2 because his fan stopped working (it’s still very hot here).

A pot filled eggs for breakfasts
Irrelevant picture of the week: My weekly egg boil, prepping breakfasts for the week because 1. I’m lazy and 2. we have to be out of the kitchen by 8AM, and I’m usually entering the kitchen at 7:50 which means no time for actual cooking.

We think it was actually a planned outage, but what good is a plan if no one tells people about it? I guess someone knew, but that someone wasn’t anyone connected to us. I would have charged my electronics and printed things out the day before to make it possible to keep moving on my work. But nope, it seemed like everyone’s laptops and phones were on the brink of death. Obviously, the wifi also wasn’t working. All of the essential ingredients for a productive day.

On top of that, no electricity meant that the water pumps weren’t working… so there was also no running water. The morning was a mess of running around and trying to minimize the impact of the outage. Debbie went and got bags of ice to put into the fridges and freezers to keep them cool. Paul and I scooped water out of the storage cisterns and distributed them around the campus so people could bucket flush their toilets.

At home, if the power goes out in an office or a school with no generator, the rest of the day is a wash. You’d almost definitely be sent home. In this case, the programs were still happening which meant that we needed to be ready for the kids at the end of the school day. There were still lunches to cook and classes to teach. It’s not like power outages are necessarily THAT big of a deal on a small scale, but at an institutional level where you’re trying to avoid interruptions to operations, there’s a little more work involved.

I really lucked out with the whole thing. After we made sure everyone had the water they needed, Debbie invited me to join her on an errand run to Lima since it wasn’t likely to be a very productive day in the office. Yes please! We went on quite the shopping adventure. I got to tag along while she went to wood suppliers to get quotes and put in a wood order. We went to the hardware store and got tons of paint and other supplies for the mission team that’s coming next week (more about that later). I got to check out what electrical products are available here which will be helpful for finishing up my drawings. We went to KFC for lunch, and I celebrated having a break from beans (we usually have some variation of beans and rice for lunch on Monday, Wednesday, and Friday. Tuesday and Thursday are special meals and are generally more interesting). The day was exhausting, but I was happy for the change of scenery and the chance to experience something new!

The van filled with wood and other supplies for the upcoming week
The inside of the van at the end of our shopping day

The other big event of the week was an earthquake! That’s not as dramatic as it might seem because earthquakes are common here, but this one was a little bigger than just a tremor. I was in the bathroom washing my face, thought it was a truck driving by at first (because the streets in our neighborhood aren’t paved which means you feel EVERY truck), and after a few seconds was like, “NOPE THAT’S NO TRUCK,” and ran out of the building. I met Debbie, Julie, and Irma (the head psychologist) outside, and they said this one was stronger and lasted much longer than most. Julie looked it up afterward, and there was a 4.9 magnitude quake about 20 minutes south of us. Cool! (I can say that because we’re all okay.) There was a little shake last week too, but this is exciting because it’s the first earthquake that I felt and actually recognized for what it was.

That’s about it for the significant events of the week. Next week (starting today) is going to be insane because there’s a mission team coming from the States. During team weeks, everyone is running around constantly. My daily schedule will be pretty nonstop from 7AM – 8PM. Prayer requests for a good week for the mission team, endurance for me and the rest of the crew, and for safety! (Hopefully I’ll remember to take more pictures than I did this week…)

I’m going to be living in Gyumri, the second biggest city in Armenia, for the next two months. Gyumri was one of the cities hit hardest by the 1988 earthquake, and it still hasn’t completely recovered. Also, fun fact, I felt an earthquake today! I was alone in a room and thought that I was losing my mind, but it went on long enough that I knew it HAD to be an actual earthquake. Apparently tremors are not uncommon here. Eek.

Anyway, like I was saying, Gyumri still hasn’t recovered from the 1988 earthquake. There are buildings around the city that are completely collapsed, and it doesn’t look like anyone has even thought about trying to clear the rubble. Of course, though, a ton has been done to clean things up and rebuild. It’s just crazy to me how a couple minutes can ruin centuries of work and lead to decades of recovery.

I think I’m going to like it here though. Yerevan is awesome, but it’s basically like being in a city in Europe. There, signs are written in Armenian and English. Here, signs are written in Armenian and Russian. There is a Russian military base here with about 3,000 soldiers. I don’t know a lot about military bases, but to me, that seems pretty big. So as you might imagine, there are a decent number of Russian people here, plus all of the older Armenians speak Russian.

Sorry, got sidetracked again. Like I was saying, being here is going to be a challenge, and I’m determined to feel like I belong here. That means step 1 – learn Armenian. Step 2 – make local friends. Step 3 – force local friends to hang out with me.

On the topic of learning Armenian… I’m living with a woman, Anjela, who is really nice, but she doesn’t speak any English (yes, she does speak Russian), and I don’t speak any Armenian. It’s been interesting so far. Luckily, she’s very patient and has had volunteers stay with her before, so she’s used to having to use hand motions more than most people. I think that she probably hasn’t had many people who are basically mute like I am, but we’re figuring it out. I usually try to speak and then within 1 second realize that literally zero words are coming into my head (or if there are words, they’re all in Spanish), so I just stand there with my mouth open.

The biggest struggle is when it comes to food. When I got here, they asked if I have any dietary restrictions. Well… that’s a complicated question. The answer is that there’s pretty much nothing I CAN’T eat, but there are plenty of things that I WON’T eat. It’s impossible to give a list because it’s so long, so I usually just say that I don’t eat fish and that’s it. It probably seems like it doesn’t make sense to say that I’ll eat anything when I basically eat nothing, but what other option do I have? Then, when something comes up that I really will absolutely not eat, I can say, “I don’t like ___.” The problem with that? I don’t know how to say that in Armenian. So instead, there’s just a lot of me saying no and shaking my head and her giving food to me anyway. I know it seems like this is a problem easily solved. I could just look up how to say, “I don’t like”. The bigger issue is getting myself to the point where I don’t completely panic and forget everything I’ve ever known when it’s time for me to say something. We’ll work on that.

Next step is remembering how to say, “I’m full,” because the stereotypes are true. If you don’t refuse forcefully, you will be fed until you explode.