Me laying in the flowers

I’m back in Peru! I got in late last Monday night and spent Tuesday wrapping my head around the fact that they poured another floor while I was gone. That’s right, we have a 2-story building now! And even though there are no walls on the third floor, we can walk up there and see what the view is going to be like when it’s finished (the other buildings on the property are only two stories or less, so this is a new experience for us). Essentially, all the third floor means, view-wise, is that we will be able to creep on our neighbors exceptionally well. Like the ones next door who have a pool that we’re all very jealous of (though to be fair, we already knew about that thanks to the drone).

Mountains from the 3rd floor
3rd story views
View of the new building from behind
As you can see, we have two stories on the left (Module 1) and one story on the right (Module 2). The existing bathroom building is in the middle (with the bricks piled on top).
Construction site
With our new view from the “3rd floor”, you can get great pictures of the rest of the property. Here’s the construction site, and at the top of the picture, you can see the septic gardens (top right) and the equipment/workshop building (top center).
Concrete mixing area
Here’s the area where they do the concrete mixing (bottom left). You can see the piles of different materials, and they usually have the mixing drum right in the middle. The long, bamboo-fenced area running along the top of the picture is where we store a lot of construction materials (for maintenance and stuff, not for the actual construction project). And you can kind of see the neighbors’ pool deck.

As I was saying, the construction has made big strides since I left. I was a little sad to miss out on some of the fun, but no need to get too upset about it because there’s still much to do. Now, they’re starting to work on the first-floor ceiling on the other side of the building (Module 2). I wasn’t super involved with the foundation phase up until they started the ceilings, but now they’re finally installing electrical-related things which means I have more to do! As they’re laying things out, I’m making sure that everything is in the proper location and that it’s going to work the way I designed it. It’s crazy getting to see it all come together!

Ceiling scaffolding
There’s nothing like a good scaffolding forest…
Looking through the roof supports at the existing building
Standing in the second floor hallway looking towards the new building… these buildings are going to be connected when we’re finished!
Module 2 in progress
Ceilings coming soon! The beginnings of the ceiling for the first floor on Module 2!
Boards covering half of the Module 2 classroom
Halfway there!
Module 2 from above
Adding in the steel for the beams
Junction boxes on Module 2
You can see the little, white electrical boxes sitting on top of the wood. Those are for the lights, ceiling fans, and smoke detectors in this classroom.
Stack of bricks on the ceiling formwork
Nearly ready to start adding the bricks!
Looking up at the ceiling
This is what the ceiling scaffolding/formwork looks like underneath after the bricks are added. Between the bricks, above where the wood planks are, is the poured concrete.

I’ve also had fun getting to be somewhat hands-on in the construction process. For example, the electrician came last week to direct the construction crew on where he needs tubes for the electrical wiring, and first, he and I walked around and made sure that we were happy with the locations of the devices. I chalk-marked the walls in the stairwell showing where I want the lights, and he and I talked through some locations for the electrical boxes. This is way more than I would be involved with on a job in the States. There, the engineer essentially just shows the way they want the system to work and then leaves the details to the electrician. Here, I had to include much more installation-related information on my plans, and now, I’m getting to see it all through. How cool!

Me and the electrician on site
Me talking to the electrician and looking very official in my hard hat (though not wearing appropriate footwear).
One of the guys standing on a board spanning between a ladder and a water drum
Do you like this work platform? Very safe… Don’t worry, he’s not doing anything dangerous… just using a saw to cut the channels in the brick wall for the conduit
Box and conduits set into a wall
Nice and ready for some wires!
Mason putting stucco on the wall
Applying the stucco
Half of the wall with stucco, half still brick
Stucco job in progress
Mason smoothing out the stucco
The mason working on the stucco. I’m still not quite sure how he manages to get it from this lumpy mess to completely smooth. He’s using that piece of metal in his hands to level it out a bit, but that seems like a very long process
Finished stucco wall
Smooth!

Besides the construction, things have been nice and chill since I got back… well, with the exception of actually getting back into the country. I had a little scare in the airport on the way in because I’ve already overstayed my welcome for the year. You can technically only stay for 90 days each year without additional paperwork. When the lady at immigration told me I had already exceeded my allowance, I was worried that they were going to put me right back on a plane home! But thank goodness they let me back in, only giving me a 30-day visa instead of a 90-day… which just means that I definitely can’t leave the country again this year until I’m sure that I’m ready to be gone for good, and when I do leave, I’m going to have to pay 60-days’ worth more for the exit fee (that’s the punishment for overstaying your visa, a fee that accumulates for each day beyond your allowed stay).

Aside from that whole mess, though, things have been good. I’m not feeling overwhelmed or overworked (yet). I’m happy to be back working on the project. It’s been a fun week of hanging out with the roommates and getting back into some good habits. I think my trip home came at just the right time, and now I’m back and feeling ready to have a strong finish to my time here.

I want to make the most of the time I have left, so I’m trying to be more proactive about doing things on the weekends. On Saturday, Julie, Jocelyn, and I went on an adventure walk (aka a hike, but Julie thinks that doesn’t sound fun enough). The mountains near where we live are usually nice and brown, adding some extra brownness to the rest of the brown of the desert landscape. Since it’s been such a humid and misty winter, some of the mountains have turned green! I don’t know how so many little plants managed to spawn in such dusty ground, but I’m not upset about it! From a distance, the mountains look like they’ve just gone a bit moldy.

Road cut out of a brown mountain
Spot the moldy mountains
A half-green, half-brown mountain
How weird is that line between green and brown??

We’re starved for green landscapes here, so we decided to take advantage of this favorable development and investigate. What does that entail exactly? Well, we had to cross over one row of brown mountains before getting to the green ones, so we looked for a path that didn’t seem too exhausting. We walked from our property through our neighborhood and the next one until we got to the foot of a low point between two peaks. I thought maybe that would mean it was easy to cross over. No. I was wrong (rare occurrence, but happens every so often).

It wasn’t “easy”, but we made it over after nearly 30 minutes of walking up a mountain slope that might as well have been vertical. Seriously, it had to be at least a 75-degree incline. And then we had to walk around the mountain on a skinny, slanted path, only one foot-slip away from a tumble all the way down the steep mountainside. The verdict? Not the best route we could have taken, but live and learn!

 

Climbing up the mountain
Julie and Jocelyn having so much fun…
The neighborhood from the top of the hill
The neighborhood!
Selfie at the top
We made it!… to the top of the “gap” between mountain peaks
Jocelyn walking on the little path
The long, winding path around the mountain
Selfie in the wilderness
Our discussion topic at this point: “When I imagine the wilderness, it looks something like this.”

After that, though, it was heavenly! We learned that the moldy green is mostly wildflowers! There was practically a line separating the brown from the green, and after we crossed over, it didn’t matter how steep the path. We were too busy raving about the smell of plants in the air and the fact that there were actual flowers (no irrigation system required!) and marveling at how much happier we felt being surrounded by green life instead of brown dust. It was magical.

Pretty green mountains
It’s like we’re not even in Chilca anymore! (spot the Jocelyn)
Green mountain selfie!
Just happy to be here, breathing in the fresh, plant-supplied air
Green mountains
It doesn’t even look real!! Such a vibrant green
Me laying in the flowers
Just happy to be here
Mountain color progression
Contrast… Green to less green to less green to BROWN
Cactus in a field of green
Despite the addition of these new plants, we’re still in the desert!
More green
Can we live here? I’m moving.
Line of identical little houses
We walked through this weird little neighborhood on our way home. This is what they usually do when they’re marking out plots to be sold. You get this wonderful patch of dirt and this completely customized hut with your purchase!
Little, purple flowers
Flowers!!! SO MANY FLOWERS!
More purple flowers
Can’t. Get. Enough.

On top of all of that, and I’m sure that I cannot possibly convey the extent of my excitement for this next part, we discovered a new neighborhood gem. One of my favorite things to eat here is cheesy bread… exactly what it sounds like. Cheese + bread = Lara dream meal (I’m very easy to please). Our usual cheesy bread supplier is at least a 15-minute drive away, and it’s been closed for the last couple months with no explanation. BUT we recently discovered that there’s another cheesy bread place just a 15-minute WALK from where we live. We walked there to check it out at the end of our hike, and they have now been quality approved by us. This is life-changing! (no exaggeration… it doesn’t take much) I’ve never meant it more when I say that the future is looking bright!

Cheesy bread
Cheesy bread!!! This one has ham in it too
Us with an American flag at the beach volleyball court

Whew! It’s been a while since we last talked, but for once, it’s not because I’m just super far behind on updating you. This time, the delay is because of a much-needed vacation! I’m actually in the States at the moment, and I have been for a couple of weeks now. I’m headed back to Peru soon, but it’s been a very refreshing time catching up with friends and family.

The last two weeks in Peru before I left were fun and busy. During the first week, we had another mission team visiting, this time from Kansas City, Missouri. Like I said in my last post, this was an extra exciting team week for me because the team included a couple of electricians!! I spent the two weeks before the team came trying to get everything ready for their service projects, and the electrical projects added some extra complexity into the usual planning. It was cool, though, knowing that I was going to get to watch everything come together. I guess it’s kind of the same with the building project, but that seems like a much more overwhelming situation whereas the team projects feel manageable.

Brown brown brown neighborhood
The neighboring neighborhood (hehe) where a bunch of our families live. You can see some of the team members climbing up the hill!

The demographics of this team were also a little different than what is typical. Often, there are a few team members in their teens, maybe one person in their 30s, and everyone else is 40s and up. This team had the whole range of ages represented, but there were more 30-somethings than the usual. It felt a bit like hanging out with my friends from home which was a lot of fun.

The team with our neighborhood in the background
The team!
The team's boat heading out to sea
Headed out on the boat ride! I haven’t been joining the teams for the boat ride recently because last time I went, the water was really rough and I mostly spent the ride with my eyes closed trying not to puke. Not my favorite feeling.

On top of all that, Betsi’s (a 3-week intern) mom came with the team, and Betsi filled her in on how much we like brownies (we’re basically in a constant state of desperate for anything that feels like home). She brought 5 BOXES of brownies with her. Talk about an MVP. They made three of them during the week and left two for us! I know that this probably doesn’t sound like that big of a deal, but just trust me. There’s nothing better than having our weekly Sunday movie night with a warm brownie on the side.

Selfie with Dina and Betsi
Me with my friends Dina (she’s a translator at EA) and Betsi

In general, it was a great week. The brownies didn’t hurt. Also though, it was fun working with everyone, they got an amazing amount of work done, and the results of their hard work were super visible. For example, the property has felt very dark since the construction started because they took out some of the exterior lights, and there weren’t very many to begin with. The electricians installed a bunch of new lights outside, so the night after they put them up was the first in a long time where I was confident that I wasn’t going to unexpectedly walk into/trip over anything while walking around the property. Imagine that!

Electricians at work
The electricians installing some switches for the irrigation pumps we have underground
Disassembling the temporary roof on the bathroom
There’s been a “temporary” roof over the bathroom building for the last 5 years, but it needed to be removed because part of the new building is going on top!! The team helped to disassemble it. This new building is getting VERY real!
The bathroom without its roof
No more roof! And within an hour, the construction team was already storing materials up there… probably not the best idea structurally to have stacks of bricks on a roof not designed to hold them… but no one else seemed to think it was a problem sooo here we are.
Parade in Chilca for Peruvian Independence Day!
Colorful Barranco buildings
Lima sightseeing with the team!
Friends!
Jocelyn, me, Betsi, and Julie in Lima

I was the most excited about the lights along the sidewalk. They’re the first lights that I’ve picked out that I haven’t just felt neutral about. Usually, I’m picking things that are simply functional. These are functional, AND I think they look cool. They turned out exactly how I hoped, and the fact that we found lights that were actually what I was looking for is a miracle in itself.

Linear lighting underneath the walkway roof shade
The new walkway lights!! Aren’t they cool? (Feel free to keep your opinion to yourself if you don’t like them.)
Pump house with a new over-door light fixture
This is also the best thing… The front of this building used to be completely dark, so good luck trying to find the keyhole to unlock the door. But now there’s a light right above the door! And it’s also overgrown with the passion fruit vines, but that doesn’t matter for lighting the keyhole.

I’m going to totally overuse the word “exciting” in this post, but I’ve accepted it and you should too. Do you know what else was exciting? The construction! GUESS WHAT? We have our first ceiling!! It’s crazy because now I feel like I can really begin to imagine what the new building is going to look like. It’s the ceiling for the first floor on module 1, and that’s the side of the building that’s adjacent to the existing 2-story building. There’s a railing between them still, but you can climb over it and move from construction site to existing building. It’s awesome.

In the process of preparing to pour the floor/ceiling, they put in the electrical conduit (the tubes they’ll run the wires through) for the lights on the first floor and the outlets on the second floor. I had to dimension my drawings… talk about stressful! I had to make the exact final decisions about where things should go, and now there’s no changing my mind because it’s literally set in concrete.

Getting the ceiling ready for concrete
Almost ready to pour concrete! The big brick area is over/under classrooms. The corridor is the bricks to the left. The stairs are the bottom right where there is SO MUCH steel
Formwork in place for the stairs
Future stairs!
Electrical conduit zig-zagging the future ceiling/floor
This mess is all of my electrical conduits. Not quite the same way it would look in the States… Debbie and I went and checked to make sure that everything was in the right place before it was time to pour the concrete.
Ceiling with tubes in place
It looks like someone threw a handful of giant spaghetti at the roof and then decided to use that as a guide for the tube placement.
Pouring the ceiling
Pouring the ceiling!!!! We had two concrete trucks bring the material, and it was crazy how quickly it went compared to when they’re hand-mixing it
A dude with a board texturizing the top of the concrete
I was totally fascinated by the whole process. This guy came by after they made sure there were no air pockets in the pour and finished it off
Wet concrete on the stairs
Stairs!
Almost finished pouring the concrete
Just a little bit more…
Module 1 second floor!
The next day… voila! New floor!
Debbie using a hose to water the concrete floor
Debbie watering our new concrete floor to help it cure
Module 1 second floor with the beginnings of a wall and some columns
Wasting no time after putting in the floor… it took one second before they were working on the walls and columns for the second floor!
Two brick walls on the second floor
I love how quickly the walls go up
Finishing the second brick wall
Almost there!
Back view of Module 1 and the bathroom building
It’s starting to look like an actual building!

Since I left for vacation, they’ve been working on the ceiling on the second floor. Eek! It feels like they spent forever getting set up for the first ceiling, and I wasn’t prepared for Debbie to send me a picture of them already working on the next one. I feel like I’m missing too much! But I can’t be in two places at once, and this really has been a nice break. So, who even knows what it’ll look like when I get back? We’ll be surprised together.

Oh! I almost forgot. One more exciting thing! Every four years, in the year before the summer Olympics, the Pan-American Games are held. It’s like a mini-Olympics just for countries in the Americas. This year, Peru was the host country! Julie, Debbie, Jocelyn, and I bought tickets to watch beach volleyball. I don’t think any of us were expecting much, but it was a ton of fun. We cheered on a bunch of random countries until the last match where we got to see the U.S. women beat Paraguay in the quarterfinals (they ended up winning the gold). It was cool getting to see an international competition live. Now I feel like I need to go to an Olympics someday!

Us with a Lima 2019 sign... and the "9" is cut off
We asked someone to take our picture… and this is what happened. LIMA 201!! Hahaha
Selfie with the sign
We decided we’d better just do it ourselves
El Salvador vs. Guatemala men's match
There were two courts: the “A” court with the big games, and this one, the “B” court with the losers’ bracket games. We went here first and had fun being 4 of maybe 7 people in the stands. We picked whichever country to cheer for and then screamed our heads off.
Selfie at the main volleyball court
At the main court
USA vs. Paraguay beach volleyball game
We moved closer before the USA match, and we ended up with awesome seats!
Us with an American flag at the beach volleyball court
Julie, me, Jocelyn, and Debbie with Karissa Cook of Team USA! We only saw one other group of U.S. fans, and we asked them after the game if we could take a picture with their flag. Pretty sure they were Karissa’s family because they called her over to be in the picture too (and she listened to them haha).