Guys working on the brick walls

I barely had a chance to settle back in after coming back from the States. My first day back at work was a Tuesday, and by the next Sunday, the next team was here. Talk about a reality check! Not only was the actual team week full of extra responsibilities, but I also did more than usual for the pre-week preparation. Debbie put me in charge of making the work schedule and supply shopping list. No pressure! She was there if I had any questions, of course, but it was still stressful because I wanted to do a good job. Thankfully, the projects for the week were pretty straightforward, and we already had a lot of the supplies we needed. That made for a short shopping list… which almost worked against me because I felt like I must be forgetting something. (Spoiler alert: I didn’t! We had everything we needed, and the projects all went just fine. Phew!)

Green mountains out of the bus window
This is the craziest thing. These mountains are all usually brown. This is right near where we live. Recently, they’ve been turning green because it’s been such a damp winter. I wish they looked like this all the time! I like calling them the moldy mountains. The so green that they’re practically glowing, though. Radioactive moldy mountains.

This team was from Hudson, North Carolina, and it was my first time having a team come with a few people I already knew! When I was here in 2017, I was around for one team week, and it was this church. The only repeat people were the two team leaders, Rick and Kirsten, but it was exciting to see some familiar faces! Last time they were here, Rick helped Debbie and me with the soldering for our robots, so they hold a special place in my heart.

I feel like I say this about everyone, but every time I say it, it’s absolutely true… this team was so much fun! Team weeks are an extra burden no matter what because there’s simply more work to do, but there are things that can be made easier by a good group of people. Everyone listened and wanted to do a good job on the work projects, and on top of that, they were all interesting and entertaining people. We have a unique opportunity in being here to build solid relationships with people from all sorts of different places and backgrounds. It’s pretty cool!

Selfie by the ocean
Me and Jocelyn by the ocean on our team sightseeing day in Lima

We kept plugging away at the work projects, and guess what? The bamboo fence is finished!!! It only took like 3.5 weeks’ worth of work. Like I said in my last post, the team from Pleasant Ridge finished putting it together, but there was still a bunch of detail work left. My Hudson fence crew helped with some final sanding, stuffed the tops of the bamboo with this material that I think is a type of plaster? (not really sure about the English translation, but we put it in there to keep the kids from sticking trash inside – hehe – and to keep bugs out), reinforced the connections between the poles and the horizontals with wire and wicker, and finally, touched up the varnish job and varnished over their wicker wrap. Things I never thought I would do in my lifetime: wicker a fence. What a ridiculous concept! So yeah, that all took seemingly forever to finish, but now it’s done and I’m a bamboo fence expert!

Half of the fence
THE FENCE!
The fence with all of its beautiful, finished details
IS FINISHED! Look at that fabulous wickering! (Wrapping pattern designed by wicker experts Lara and Jocelyn.)

One of the other work groups kept going on the trench for the septic system. That has also been an endless project, and I still have no idea what they’re doing. I assume they did a good job… they dug and dug and the hole looks different from when they started, so let’s just say that everything went well.

Wooden thing getting varnished
One of the side projects was finishing these wooden covers. They’re going to go in the ground to cover holes in the sidewalks where we have water tanks/pumps/whatever other secrets are hiding down there.

The last big project was setting up an irrigation system for some new plants with the optimistic goal of actually planting them before the team left. Have you ever installed an irrigation system? It’s not terribly easy. I mean, I suppose someone thinks that it is, but that person has probably done it a million times. All I know is, getting the system to work across the entire planter was quite the feat.

The trench the team dug for the irrigation line to the new plants
The irrigation trench

Friday morning was a stressful mess of adjusting the pipes, raising and lowering them to try to get water to flow the way it needed to. It seemed like maybe it wasn’t going to happen, but after lunch, Debbie announced that we were going to plant the flowers! I can’t take any credit for getting it to work, but I was happy to share in the fun of planting. It was exciting to see that project finally coming together, too. If you count from when they started building the planters, it’s been a work-in-slow-progress since March!

Team members digging out holes for the plants
Getting the planter ready!
The irrigation tubing in the planter
Check out that beautiful irrigation line
The flowery plants that we put in
Pretty flowers!
Cutting off the bottoms of the plant bags
Getting the plants ready to go in the ground

In other news, WE HAVE WALLS! Sorry, topic change. The construction is moving! We’re making some VERY visible progress. WE HAVE WALLS!! Enjoy these pictures of the construction site that actually is starting to look like a building! AHHHH!

Brick walls in progress
Starting to lay the brick for the walls in Module 1
Walls starting to look more wall-like
A mere 5 hours later…
Finished walls in Module 1
We might as well stop now because it’s basically finished
Module 1 with its brick walls
Like… what is this? It’s like a real building! Almost. Nearly. You can see the formwork up for the column in the back right corner.
Brick walls around the future stairwell
Future stairwell
Pouring the concrete for a column in the dark
A little late-night concrete column pouring in Module 2
Module 2 with formwork-encased columns
Here are the Module 2 columns still in their formwork
Module 2
Module 2 looking good with those fresh columns
Module 2 pre-walls
No walls
Module 2 with some new brick walls!
Anddd walls!
Guys working on the brick walls
I can’t get over how quickly this happened in comparison to everything else in the construction process thus far! We went from no walls to all of the walls in like 3 days

And so, we wrapped up another successful team week. As always, it was sad to see everyone go. This time, I was half asleep because we didn’t say our goodbyes until about 10:30PM (I started feeling like I was falling asleep around 8. Is this old age setting in?), so it wasn’t as traumatic as usual. Plus, a few members of the team were sticking around for another week to do a medical clinic for the families, so it wasn’t a full goodbye. AND we picked up a new arrival from the airport, an intern, Betsi, who is going to be here for three weeks. So even though one busy week ended, it didn’t mean things were going back to normal. I’m not sure I even know what normal looks like anymore.

Wave coming into the beack
We stopped at the beach along the way to Lima, and though I don’t think the picture shows it very well, the waves were huge!
The group walking through the pretty walk to the ocean
Sightseeing with the team in Lima
Foliage-covered walk down to the ocean
So much green! (This is all it takes to make us VERY happy. We’re very easy to please, after living in the brown desert.)
Me and a team member working on the fence

Remember when I said that I was going to post weekly blogs? Well, if you don’t, then please, continue to not remember. If you do, whoops. As you can see, things aren’t exactly going as planned. The thing is, life has been VERY busy. I know, life anywhere is busy, but there’s something about being here that makes everything a little bit harder and a little bit more tiring. Recently, with all of the teams coming through, it’s been extra hectic. When a team is here, we’re running around and trying to manage everything that goes along with that. When there isn’t a team, we’re running around and trying to catch up on the things that fell to the wayside when there was.

So, what has happened since my last update? That’s a big question! It’s been five weeks, but I’m going to focus on the first four right now because that’s basically the month of June and is already far too much to talk about in one post. The first week was another team week, two days after the previous team left. The second was a “normal” week, the third I was in the USA, and the fourth was another normal one. My gosh. Like I said, I definitely need to be better about writing updates because have a lot of ground to cover! Let’s start with the team week…

Team selfie on our way to Pucusana for lunch on the team’s first day

Last time, I told you about the team week with ACF, a Christian student ministry at Penn State. Usually, teams are here for seven days. ACF was here for TEN which is essentially a 10-day marathon. And on top of that, they’re a bunch of college kids with lots of energy (they made me feel old, but I’m surprisingly okay with it). So, at the end of that “week” we were, understandably, all feeling a bit drained.

They left on a Thursday afternoon, giving us only two days to recover before our next team arrived. This one was also 15 people, they flew in Saturday night, and we hit the ground running on Sunday. It was interesting going from the college crew to a team with more varied ages and skills. This team was from Pleasant Ridge, a church in rural PA. I can’t possibly say enough nice things about them, and it’s not even just because I’m putting this on the internet for the world to see. They were incredibly hard workers, fun and nice and interesting people, and thankfully very easygoing. It was such a joy to have them here.

Sea lions flopped on the rocks
So many sea lions! Also, the sea was INCREDIBLY choppy, and except for the moments when I opened my eyes to look at the animals and take these pictures, I was trying not to get sick from all of the rocking and bobbing we were doing. I don’t get motion sick easily, so it was an exceptionally rough ride.
Penguins on the rocks by the ocean
Can you see the penguins? I’ve never seen so many at once! Though this is kind of a terrible picture. They blend in a bit with the white poop-covered rocks.
Selfie with Pleasant Ridge at Huaca Pucllana
At an archaeological site with the Pleasant Ridge team!

We made an amazing amount of progress on the service projects! We had one crew, mostly of the younger guys, who continued the work ACF started on the trench for the septic system pipes. They worked like a well-oiled machine. I felt like every time I looked over to check on them, they had a new piece of pipe installed, the dirt filled in on top of it, and a new section of trench already dug out.

The three trench-digging guys working hard
The trench squad, doing an awesome job (Pic by EA photographer David)
Small remaining section of trench
Where the trench people left off. The pipe they installed stretches straight from here to the end of the concrete patio you can see on the left
The septic pipe route
Then, the pipe cuts diagonally along this whole stretch of dirt
The septic trench stretching across the property and under the swing set
Here’s that section before it got filled in. Look at how deep and skinny it is. I honestly don’t even understand how they managed to dig it so skinny.
The last stretch of septic pipe
And it goes underneath the sidewalk and through the grass patch… you can see exactly where it goes because the grass was removed during the digging process, and the grass around the trench died from getting stomped on so much.

My bamboo fence squad finished installing the fence posts, and at the end of the week, it finally looked like a real fence!  It’s a bit of a pain, though, because it’s one of those jobs that is 95% finished, but the last 5% of work seems to take as long as the first 95. There’s lots of tedious detail work to do after the posts are installed, and that’s slowly been getting checked off in the weeks since.

Two of the team members attaching vertical poles to the bamboo fence
The two most dedicated members of my fence team. They made it happen! They were determined to finish attaching the poles by the end of the week, and they did it! (Pic by David)
Me and a team member working on the fence
Me working with my fence post buddy! She and I worked super well together and helped with the attachment of the vertical posts when we weren’t off working on other things. (Pic by David)
The fence, nearly completed
The fence! The fence! They’re almost finished!!

Besides those two big jobs, they crossed off so many other, small jobs that have been lingering. For example, there were some concerns about the construction fencing near the school buildings because the little kids are completely oblivious, and there was a real chance of one of them wandering past and falling into one of the foundation holes on their way to the bathroom. We had some of the team members build a more substantial barrier using plywood which has been very good for the peace-of-mind of our teachers.

The soccer court with a new wooden wall
The new construction site wall separating the site from the school area. It’s so much better!
Team member taking some measurements for the construction barrier
Putting together the construction site barriers (Pic by David)
Some of the team members painting the workers' shed exterior
Finishing up a second coat of paint on the workers’ shed. (Pic by EA photographer David)
The new ties to attach the canopies to their frames
They also helped out with a project to fix the shade canopies we have. They were all falling apart, getting disconnected from the frames every other second. One of the team members and I came up with a new system for attaching them (see the ties on the corners and the middle of each side?), and so far, it’s been working!!
Julie toasting a marshmallow with her hat pulled over her eyes
At the end of the team week, we had the world’s hottest bonfire. Julie used her hat to attempt to block her face from some of the overwhelming heat while toasting her marshmallow
Me, hiding behind a chair to toast my marshmallow
We all had our own strategies for staying protected from the heat… mine involved sacrificing a chair to save myself. Just kidding, the chair survived unscathed. My fingers still nearly melted off.

Meanwhile, the construction has been steadily moving along. The foundations are finished! No more giant holes in the ground (so I guess there’s no more danger of the kids falling in, but definitely still better for them to be kept away from the site either way). It’s exciting/nerve-wracking/strange to see something that looks like a building finally starting to take shape! They poured the bases of most of the walls which means that we can actually see how big the interior spaces are going to be. I’m starting to go into a bit of a panic because this means it’s nearly time for some of my conduit to be installed (the pipes that they put the wires in), and after that, it’s concreted in which means it isn’t changing. I hope I didn’t mess anything up! Eek!!

Rather than trying to explain everything that’s happened, I think it’ll be much more effective to show you in a series of approximately 1 million pictures. So here you go! (Brace yourselves, it’s going to be a looong ride.)

Foundations of Module 1
Module 1 foundations, poured and with the formwork removed and the foundation coating painted on
Foundations with dirt haphazardly thrown on top
After the foundation hole was filled in… they didn’t do a very good job of compacting as they added the dirt, so re-doing that process correctly was a big pain.
Columns going into place in Module 1
Putting on the formwork for some columns!!
One of the construction workers leveling off the dirt in Module 1
Leveling out the ground. And check out those columns!
The dirt in Module 1 looking nice and level
Nice and flat!
Packed dirt in the footprint of our stairs
The beginnings of our staircase!

So that’s the first side of the building… and now, on to the other side:

Rebar for the building foundations
The steel for the foundations on the second side of the building (henceforth to be known as Module 2). The foundations for this building are CRAZY. Look at all of that steel!
Rebar for one of the big foundation beams running underneath the classroom
LOOK AT ALL OF THAT STEEL!
The foundations in Module 2 with the formwork for the concrete
The formwork for the foundations. This side of the building is just out of control. So. Much. Wood. So. Much. Steel. So. Much. Concrete.
Module 2 foundations setting in the formwork
After the concrete was poured for the foundations
Module 2 after the foundations were poured
A view from (kind of) above
Module 2 foundations without formwork
And the formwork was removed!
Module 2 with the beginnings of the walls in place
This is how it looked when I came back! The ground is getting filled in, and you can see the concrete has been poured for the bases of the walls!
Front-end loader moving dirt into the foundation hole
Starting to fill in the dirt in Module 2 with some help from our friend the front-end loader
Filling in the dirt!
Module 2 with some new formwork on a column
Getting ready to pour some more columns. You can see the new formwork on the middle column on the right.
Two guys working on wrapping the rebar around the columns
Working on the columns. Is this not the sketchiest scaffolding you’ve ever seen?

They have already installed the conduit that goes underground from one side of the building to the other, so I’m crossing my fingers super tight that I sized those correctly. My gosh this is a stressful situation! Why on earth did I become an engineer? I should have picked something where mistakes are more easily remedied. Not that I think I made any big mistakes (I already found and fixed a few little ones), but I think it would be abnormal for me to NOT panic at least a little about this whole thing. It’s my very first time having a design that’s all mine actually get installed. Sure, when I was working, there were a few projects where I played a large part in the design and felt a sense of ownership when I walked through the finished space, but this is different. This is me being trusted to make the major decisions and hoping more than anything that I’ve created a design deserving of that trust. No pressure or anything.

I’m rambling, I know, but I ramble when I’m nervous. I’m nervous. It’s weird because I really am confident in the work I’ve done so far, but it doesn’t matter. Until this building is finished, everything is installed, and it’s operating properly, I won’t feel completely at peace. I’m insane, I know. It’s going to be a long year of unrest, that’s for sure.

With all of that happening, it was probably a great time for me to take a break and go back to the States for my friend’s wedding. It was fun getting to catch up with friends, plus the week I had at home beforehand was so nice and relaxing. I think I needed it, and it left me feeling prepared to come back and jump right into the work ahead.

Sunset view from the airplane window
The sunset on my flight back to Peru

We had another team here about a week after I got back, so it was back to the chaos of running around and managing service projects and hoping that things go according to plan. It’s always fun to get out of the office and actually get my hands dirty, but it also makes for an exhausting schedule! I’ll tell you more about that week in my next post… which is coming soon (and by “soon” I mean definitely before another 5 weeks go by).

One of the team members and me working on the fence

Are you tired of reading updates where nothing has changed? WELL, then today is your lucky day. Things are happening! My gosh, and it’s such chaos that part of me wishes FEWER things were happening, but isn’t that always the way these things go? There’s nothing nothing nothing and then EVERYTHING hits at once.

I’ll start off with the words I’m sure you thought you’d never hear… construction started!!! We had the first workers onsite two and a half weeks ago, and things really got going about 4 days in when they brought the front-end loader back onsite to dig the foundation holes. That was also the day when our next mission team arrived, 15 people from ACF, one of the Christian campus ministry groups at Penn State.

The site with construction materials organized
The site back when it still looked remotely organized. The wooden formwork for the concrete is in the background, the concrete mixer is to the left, and the steel rebar for reinforcing the concrete is under the blue tarp.

If that sounds like a lot happening at once, just wait. To say that construction got off to a rough start would be the understatement of the century. In ONE day while they were digging the foundation holes, they cut FOUR tubes that were not supposed to be cut. Four tubes that were in known locations. It’s so sad that it’s almost comical, but at the same time, it’s not funny at all because that kind of thing should not be happening. The water lines to the two back buildings were cut, plus the electrical ground line to one and ALL of the electrical power to the other. So besides being a bit stupid, it also had the potential to be dangerous. Thankfully, no one was electrocuted, the water lines were quickly repaired (though then there was dirt in the lines which clogged up the plumbing fixtures. So, all of the toilets ran constantly after the first flush until they went through the property’s entire water supply. A water truck came to refill our water tanks, and the toilets were shut off and bucket flushed until the dirt could be cleaned out. Fun, right?), and the electricity was restored a few days later when we luckily already had the electrician scheduled to come.

The front-end loader getting ready for another go at the hole
The front-end loader digging out one of the foundation holes. This was pre-pipe breaking.
A large hole in the ground
The second foundation hole
A giant pile of dirt from the foundation holes
Our lovely dirt pile. The grounds are looking a bit rough at the moment…

Thankfully, since then, there have been fewer… mishaps… with the construction, though every day still does seem to have its share of crises. They poured the concrete for the foundations on one side of the building on Friday, and now they’re working on setting up the steel for the foundations and columns on the other side. Seeing the columns sticking up makes it easier to imagine a building there, and it’s insane. This building is going to be huge compared to the existing buildings because it’s going to have a whole extra story! I don’t think anyone really understands how massive it’s going to look.

The beginnings of the foundations
On side #1, they started by assembling the steel for the foundations and attaching the columns. You can also see the wooden formwork starting to go in to contain the concrete when it gets poured later.
The building progressing
More steel, more formwork, and the world’s most terrifying scaffolding.
Most of the rebar and formwork for the foundations on side #1
Almost ready for concrete!
Concrete pour in progress
The concrete was poured on Friday, and it was an all-day event. They had extra guys working, and it was nonstop mixing and dumping wheelbarrow after wheelbarrow of concrete into the foundations. The guy at the bottom is using this tool that vibrates to help the concrete settle and eliminate air pockets.
Concrete foundations poured!
The end result
The concrete mixer, piles of materials, and crew
The mixing crew. Gravel, sand, concrete, water, repeat.

The construction alone is enough to make life here crazy, but that’s not all that’s been going on. Like I said, we had FIFTEEN additional people on the property for the last week and a half. I didn’t think the number sounded like a lot until I saw it in human form. Trust me, it’s a lot. Especially when they all need to be managed and directed. They mainly worked on three projects: 1. Digging a trench to put in a new septic line (at the deepest point, it had to be something like 2 meters deep), 2. Finishing the drywall and painting the bathroom/break room for the construction workers, and 3. Building a new bamboo fence near the soccer court.

My major job while they were here was managing projects #2 and #3. You ask, “What do you know about drywall, Lara?” WELL, I watched a very informative 2-hour-and-15-minute video about drywall installation, so I’m basically an expert now (I can send you the link if you’re interested. It’s truly thrilling. Strongly recommend watching it at 1.75 speed). You ask, “What do you know about bamboo construction, Lara?” WELL, um… nothing. You know that saying “Fake it ‘til you make it”? Story of my life right now. It’s the same strategy as when I’m in an unfamiliar city and don’t know what direction I need to walk… so, I take a guess and march confidently in that direction until I get my bearings. And then I turn around and march confidently in the opposite direction.

Debbie and the two bamboo guys looking for the perfect bamboo
Debbie picking out bamboo from the bamboo store for our fresh bamboo fence… because obviously there are bamboo stores because where else would you go to buy bamboo?
Bamboo standing on end at the bamboo store
Bamboo forest
The delivery truck loaded up with bamboo
Our bamboo delivery vehicle.

Debbie did go over the general processes before releasing me into the wild, but as clear as everything seemed when it was being explained, it was a whole different story when we got to the actual execution. I had a lot of follow-up questions.

How did it all turn out? Surprisingly well, actually. The drywall/painting project is finished and looks better than I expected, honestly. There are definitely some parts that are a little rough, but it’s a utility space which means that’s not a huge deal. It’s just going to get banged and dirtied up anyway. The most important thing is that it’s finished, so the construction workers can actually start using it for their break room/changing area instead of the little closet they’ve been crowding into.

Mudding over the joints to get ready for painting
Some of the drywall/painting crew, hard at work.

The bamboo fence is still a work in progress, and I’m very optimistic about how it’s going to turn out. So far, we have all of the pieces prepared (they had to be cleaned, cut, sanded, painted with insecticide, and varnished), and the columns are in place. At least half of them are properly aligned which is promising. The other half was just installed, so we haven’t checked the fit of the horizontal beams yet. Fingers crossed! Hopefully the next team (which is already here. They came in last night!) can finish it off this week.

Bamboo laying out to dry
The treated and varnished bamboo for the fence
One of the team members and me working on the fence
Working on the columns for the fence with one of the team members (Pic by the EA photographer, David)
Me and a team member tying caution tape around our fence-in-progress
Putting up a worthless caution-tape barrier around our columns as their concrete footers set. The kids all proceeded to ignore the caution tape completely during recess. We basically had a human wall in front of the columns, trying to keep balls and kids from knocking them out of alignment before the concrete could harden enough to hold them in place. (Pic by David)

The septic trench is also not finished, though they did make amazing progress and even started to lay the pipe. The deepest part is finished, there’s a tunnel underneath the sidewalk, and the next segment is marked out and started. It’s crazy! They managed to make it so deep and skinny; it’s like a crack in the earth. They started having to reassign the shorter people on the team to other projects because the sides of the trench were getting too high for them.

Septic trench
The trench! It doesn’t look super deep in this picture, but the far end is at least 2m from top to bottom.
The trench and under-sidewalk tunnel
The tunnel under the sidewalk! So glad I wasn’t involved with the digging of that…
The team standing in their trench, holding digging tools
The team in the trench. I’m looking awkward on the far left. Also it looks like I have a double hand and super wide arm, but I promise I haven’t mutated in the last few months, so we’ll blame it on the picture.

The final craziness of the last few weeks is EARTHQUAKES! During the 10 days that the ACF team was here, there were THREE that we very clearly felt. The first happened on the team’s third day. We were at lunch, and it was super short but felt STRONG. In my head, it was like I was seeing through broken glass. Sharp and very pronounced. I don’t know how else to explain it.  There was no question in my mind that it was an earthquake, and the kids and staff were on the same page because we all stood up practically in unison to evacuate… except for the team. The teachers started grabbing little kids out of their chairs, and everyone started moving to the doors. I figured I should clue the team members in, you know, just in case the building was going to decide to fall down. I thought that they’d figure it out quickly once they saw me, but that was definitely not the case. It went something like:

“EARTHQUAKE!” At this point, I was yelling because it was loud but still very calm.

“What??”

“EARTHQUAKE!!” Starting to lose my calm…

“Huh?”

Jocelyn and me in front of a pile of mud bricks
Jocelyn and me at Huaca Pucllana, an archaeological site in Lima. We went with the team on their sightseeing day. That’s a giant pyramid of adobe bricks behind us!

“EARTHQUAKE! WE NEED TO LEAVE!” I signaled with my hands. I was ready to just leave them if this didn’t work. Finally, they got it and joined the crowd headed out to the soccer court. Geez, good thing the building didn’t fall down! No one on the team felt it, and I think they were a little skeptical that it even happened until enough other people confirmed it. Really though, why would I make up an earthquake??

The next one was the extra crazy one. It happened at 2:40AM last Sunday morning. I woke up VERY quickly, and when we were still shaking after like 10 seconds, Debbie and I got up to leave. She pounded on Jocelyn’s and Julie’s doors on the way out, and when we got downstairs, it was STILL going. Our “safe area” is in the dirt outside, and usually, once you get off the sidewalk, you can’t feel anything. Not this time! Even on the ground, we could absolutely feel the shaking, like a deep rumble underneath our feet.

It seemed to go on forever. In the quiet of the night, Julie’s cat meowed his distress from inside his crate. Our metal stairs “thunk, thunk, thunk”-ed against the building, and the steel for the new building’s columns clinked together like wind chimes in the distance. And all we could do was stand there and wait. It was eerie. In the morning, Debbie said that it lasted 2 whole minutes. Two eternities in earthquake time. It was an 8.0 magnitude earthquake about 500 miles away from us, at the edge of the Amazon, 70 miles below the surface. Whatttt?! I don’t think there was much damage, thankfully, because of the location, but you can bet that EVERYONE was talking about it the next day. What a weird thing. As someone who comes from a nearly earthquake-less area, the feeling of the ground shaking beneath me is insanely discomforting.

The EA family
The kids, teachers, team, and us. I’m sure it looks just like the picture from the last team that visited… and I’m wearing the same shirt but shhh. It’s different, I promise.

There have been a LOT of smaller earthquakes since then, way more than the usual (aftershocks maybe? I don’t know how these things work). Two nights later, there was another one strong enough to make us evacuate. Three in one week, and one an 8.0! What is happening!?

I know, this was quite the long update, but I suppose that’s what happens when things get busy and I don’t write for three weeks (oops). I’ll do better next time!

Selfie in front of the ocean

There’s a reason why I haven’t been posting every week. Well, there are two reasons, and they’re rooted in the same thing. First, I’ve been so busy that every moment not occupied by work is taken up by me trying to maintain my sanity (aka flopping on the couch and doing nothing productive). Second, work is essentially all that’s been happening, so there’s nothing exciting to report anyway. If you feel like my last three posts have been almost the same, you’re not wrong. Things are chaotic, I’m not sleeping enough, and I continue to hope that the light at the end of the tunnel will appear anyyyy second. I’m sure it’s just around this bend…

Yellow and orange flowers
Pretty flowers in Lima!
Selfie in front of the ocean
Me, Jocelyn, and Paul on a walk along the coast in Lima
Flowers strung up across the sky at the mall
Decorations at the mall for Mother’s Day.

Remember when I said that construction was starting on May 13th? Well, make that May 15th. And this time, it’s actually going to happen. Really, it is! Are we ready? Hmm. I can say for sure that I’m not. I don’t know about Debbie. I still have things to finish figuring out in my designs. This whole “designing a building” thing is a lot of work!

Things are definitely coming together, though. Last week, Debbie and I went shopping for light fixtures! Up until then, I was making lighting designs with hypothetical fixtures and crossing my fingers hoping we’d be able to find something similar. If you think that sounds less than ideal, you’re right. I didn’t realize how much that was weighing on me until after our shopping trip when I finally felt like I had a grasp on things.

Light fixtures hanging from the ceiling
Most of the pictures I’ve taken over the last few weeks have been VERY exciting shots of light fixtures. This is from the lighting market where we went fixture hunting.

After our shopping trip, we met with the guy who is going to do the electrical work. He’s done work at EA before, and he’s also an engineer which means he can help to make sure that my designs make sense! Hooray! It’s VERY reassuring to know that my plans will have a second set of eyes checking over them. Even if I was fully confident in everything I’m doing (which I’m not), I would still want someone looking things over. People make mistakes! And it’s like anything else. When you’re staring at the same thing for so long, you get to the point where you don’t even really see it anymore. You look at whatever you’re working on at the moment and ignore the rest. Even though I walked out of our meeting with drawings covered in notes about things to fix or change or update, I felt like a huge weight had been lifted. Yes, I have work to do, but at least I know I’m headed in the right direction.

So, all in all, things are good. Crazy, but that’s to be expected. Construction starts on Wednesday, and our next church team comes on Tuesday… and then they’re here for a week and a half, and the next church team comes two days after. Like I said, no “light at the end of the tunnel” in sight yet, but I’m holding out hope that it’s coming soon.

 

Jocelyn's classroom with her new projector
This job has been a long time in the making. I finally finished mounting the projector in Jocelyn’s classroom! We installed the outlet for it like 5 weeks ago when the team was here, and last week I got the wood ready for mounting to the beam. And now it’s finished! Fingers crossed it doesn’t fall from the ceiling. A nice, low-pressure job.

The last couple of weeks have been overwhelming, hence why I haven’t been posting recently. Last time, I wrote about trying to maintain a work-life balance. It wasn’t going very well then, and it hasn’t improved since. That’s why I’ve been missing in action recently. I could feel myself starting to fall apart, and I needed to cut something out in an attempt to give myself a chance to recover. I think it worked? Maybe? A little? But I’m still in the middle of a period of chaos, so we’ll see if I can make it out on the other side in one piece.

Let me try to catch you up on all of the happenings…

1. Our construction start date got pushed back again until May 13th. I know it sounds like we’re never actually going to start building, but this is the final final final start date. On May 20th, we have another team coming from the US, so if we don’t start before then, it’s really never going to happen. This is a good thing, though. We were so not going to be ready by the other date, partly because…

2. Our new structural engineer may be a miracle worker, but he’s still human and needs time to get everything done. I mentioned in my last post that we switched engineers because the first one wasn’t working out. Basically, they delivered a half-finished design, and a bunch of people found errors in their work that they refused to fix. Good, right? It was unfortunate to have to make a change in the middle of the project, but this new guy we’re working with really has it together. His design is SO much better, he meets deadlines and communicates well, and we’re actually confident that he knows what he’s talking about. Imagine that.

3. Two weeks ago was simultaneously the best and worst week because of the Easter vacation. We only worked Monday – Wednesday which would have been more fabulous if I didn’t need to fit 5 days of work into 3. It was stressful, to say the least, and by the time I went to sleep on Wednesday, I didn’t have much left in me… energy, patience, or brain functionality. So maybe it was good that it was only a three-day week.

Most of the time, I’m not thrilled about our lunches… but this was on a day with my favorite lunch, aji de gallina. It’s rice with a thick sauce filled with chicken pieces, potatoes, and a boiled egg. This picture was taken after I got seconds and was the most excited!

4. For the holiday break (Thursday – Saturday), we went on a mini-vacation into the mountains! The pretty, green, not-in-the-middle-of-the-desert mountains! It was exactly the break I needed (until I got a reality check back at work on Monday). I can’t even explain to you how nice it was to be away from the compound. Everyone was so relaxed. The mountains were beautiful. The weather was cooler. We didn’t talk about work at all. I think we all needed a bit of an escape from reality. I’m going to write more about our trip in another post because I have lots of pretty pictures to share!

The vacation crew! In the front, it’s me, Jocelyn, Julie, Dina, and her daughter Rachel. In the back, there’s Paul, Julie’s friend Kylie, and David. Look at all of that green behind us!

5. Last week was a mess. Our deadline for “finishing” our drawings is next Saturday, and yesterday we had a sort of pre-submission to prepare for a meeting this week to make final decisions about a few things that are currently up in the air. I feel overwhelmed. There are so many things left to do, and it seems like I keep getting surprised with more and more. Like maybe I asked a month ago if we wanted ‘x’ in the building, the answer was no, and last week, the answer became yes. I had a bit of a meltdown. It’s been worked out, though, and I’m praying for focus so that this can be a productive week. It needs to be.

I thought this sunset was cool until the next one…
Fiery sunset
This sunset is insane!! I took this in the stairwell on my way home from work. There’s always like a “pink hour” when the sun is setting where the whole landscape looks pinkish. It’s crazy. I call it “radioactive hour”.

6. The reason I said “finishing” in quotes in #5 is because we need to put together our drawings for pricing, but we haven’t had time to look at light fixtures yet. That means that I have maybe 20% confidence in my lighting layouts because how can I be sure about something that is based completely on speculation? At least construction happens from the ground up, so there’s some time to do research before they need to start installing pipes for the wiring and such. Still, it’s stressful to feel like I’m being pushed to make decisions without nearly enough information.

7. Even though actual construction hasn’t started, pre-construction has! This week kicked off some of the site preparation work. We had a front-end loader here on Thursday to put in a gravel driveway, and the guys are putting up a little building with a bathroom/shower and storage and changing areas for the construction workers. Legit construction companies make plans for this kind of thing – where materials will be located, where to put construction fencing, how pedestrians will be re-routed, etc. It might be okay to just wing it on a smaller project here, but this is going to be a big disruption to the programs no matter what. We want to minimize the impact as much as possible.

The front-end loader clearing the way for our fresh gravel driveway.
Then, the gravel truck came through and dumped piles of gravel for the loader to spread out. I don’t have any after pictures, but imagine a gravel driveway and you’ll be spot on, I’m sure.

Okay, I think that’s all. This week is sure to be another one of chaos with the goal of making next week slightly more manageable… until construction starts the week after, and we’re right back to chaos! Hopefully that will be an exciting chaos, though, and not the type that makes me feel like I’m going to implode.

Does anyone have brain re-forming tips? Because my brain has turned into a pile of mush and I kind of need it to be functional instead of mushy. Last week was my first full week here, and that meant finally getting down to business and figuring out what needs to get done for this building project. Part of me wishes that I was still in a state of blissful ignorance, but that ship has sailed. This project is going to be A LOT of work, and in order to do my part, I’m going to need to learn very quickly.

To give you a mini-rundown of the project, it’s a relatively small 3-story building. On the first (ground) floor, there’s a bathroom that’s existing, and we’re adding two classrooms, one on either side. On the second floor, there will be three classrooms, and on the top “floor” (it’s being called a “half floor” because it won’t have full-height walls), there will be a multipurpose space and a kitchen.

Here’s the general plan of the ground floor. The two red boxes are classrooms, the blue is the existing bathroom, and the green is the stairs. On the second floor, there’s no big bathroom, and there are 3 classrooms instead.
This is one of the renderings from the EA informational booklet about the project, showing what the finished building will look like (kind of). The building to the right is existing, plus the bathroom which is in the middle of the ground floor in the building straight ahead. The rest will be all new!
Volleyball game on the “soccer court” at recess. The new building will be straight ahead (the bathroom is behind those little white tents).

Thankfully, I don’t need to worry about any large equipment or electrical panels. That infrastructure already exists, so we’ll be able to simply connect the new into the existing system. The major “uh oh” factor is coming from the realization that even though I did have a relevant job for a couple of years, the things I did were only a small portion of what’s needed for a full design. And, to make things even worse, I don’t know anything about what products are available here or Peruvian design rules-of-thumb. Debbie lent me her code book which is great… but of course, it’s in Spanish. I can understand it well enough, but it’s just one more thing on the list of tasks that are going to take a liiiiittle bit longer than they would at home. Add all of the “littles” together, and I have a lot of work to do.

Here’s an awkward panoramic view of the office. We have 5 people sharing the space which is an adventure! My desk is the wooden one straight ahead. This is where the magic and hair-ripping happen.

Most of last week was spent on the world’s most tedious task… formatting. You don’t have to know anything about architecture or engineering to know that formatting documents is the worst. In this case, it’s the necessary prep work that will make the actual work go smoothly, but I feel like I accomplished next to nothing because there’s no physical result from my work. It’s also relatively mind-numbing. By the end of the day on Friday, I felt like my brain was made of mush (and it felt like it was functioning about that well, too). The one positive is that I mostly finished, so this week I can get on with doing actual work!

Instead of having a restful weekend, Debbie decided that we should go on an outing on Saturday. To an architecture seminar. On urban acoustics. In Spanish. She wanted me to meet her architect friends, and I’ll admit, I’m happy that we went. It was fun and the people were cool, but I would absolutely not describe it as a restful day. The morning involved about four hours of attempting to follow acoustics-related Spanish (which thankfully isn’t terribly different from acoustics-related English) and straining to remember the things I learned seven years ago (eek!) in my university acoustics class. Ha.

The topic was interesting though. The presenter just returned from a year studying in Spain, and he presented foundational acoustics information, plus his thesis topic. Side note, I was the only engineer in a room of architects, and that interaction is apparently the same no matter what country you’re in. Any time math was involved, I was basically called out with a, “but you already know this, don’t you?” I mean, no, not necessarily, but I do know how to use a calculator so I can figure it out..? Ugh. Architects. (I’m kidding, I’m kidding.) ANYWAY, his thesis looked at different road geometries (like raised roadways vs. sunken roadways vs. roads with walls, etc.) and analyzed how well the various configurations controlled the noise from the traffic. There was also a practical portion in the afternoon where we took sound measurements at various locations along a nearby street. It was fun! It reminded me of university because architecture/engineering students are always doing weird things in public for their classes. Buses kept stopping and trying to give us a ride because it absolutely looked like we were waiting for something.

By the end of the day, I was exhausted, and my brain was even more like mush than the day before. So yeah, probably not the best strategy for a brain revival, but good nonetheless.

View of the mountains from outside of the office.

Aside from work and my mushy brain, I’ve just been trying to keep myself sane. I’ve been attempting to work out on weekday mornings… I feel like I should at least do SOMETHING to offset the fact that I spend the rest of the day hunched over my computer screen, slowly pulling my hair out.

On one final note, if you’re wondering why you have yet to hear about Patagonia, it’s because of the internet. And also me. And mostly the interaction between me and the internet. Long story short (and vague), I decided I needed to change some big things about how my blog is set up to better suit the complicated disaster that it’s grown into… which meant that I needed to learn things about how the internet works. Which is something that my brain refuses to understand. BUT we survived (both me and my brain), and I think I kind of maybe sort of figured out the things that I needed to figure. I know, I’m oozing with confidence. In conclusion, ignore anything that doesn’t look quite right about my blog page because it’s a big ‘ole work in progress (but if you find something that doesn’t work, please tell me and then ignore it), and fear not. Soon enough, I’ll be confusing the heck out of you by talking about Peru and Patagonia at the same time.

One of the negatives and also sometimes positives of extended travelling is that you don’t necessarily have time to do a lot of research. I make sure that I hit the major sights (thank you, tripadvisor) and put a LOT of trust in the people working reception at my hostel to tell me what I should go see. Sometimes, that means that you know you should visit something, but you have no idea what it is… and then you go there and learn about it and are like, “DUDE! THIS IS SO COOL!”

SO COOL

For me, that happened with the Basilica Cistern, or Yerebatan Sarnici in Turkish (Sinking Cistern). The “basilica” part of the name comes from the fact that there was formerly a basilica on the site. I had no idea what it was, but I saw a bunch of tour groups going and the self-guided walking tour I was following mentioned it, so I figured I should check it out. I know, all of this makes me sound like a complete idiot, but sometimes the best way to learn about something is to just go and experience it (things I tell myself that may or may not be completely true… sometimes it’s probably good to have a clue, but that’s not the way I’ve been operating recently).

The Basilica Cistern was constructed during the Byzantine days, between 527-565AD by Emperor Justinianus I. It’s a ginormous underground water cistern, 140m x 70m and with 9m tall columns. The capacity is around 100,000 tons of water which translates to 26.5 million gallons. There are 336 columns total, placed in 12 rows of 28 columns. These are joined by arches and vaulted ceilings that carry the weight of the city above. The brick walls are over a meter thick, and they and the floors are plastered with a thick layer of special brick dust mortar for waterproofing.

Seemingly endless

The cistern was in active use until the Ottomans conquered the city. They preferred fresh water as opposed to sitting water, so the underground reservoirs went mostly unused with the exception of feeding the nearby Topkapi Palace gardens and a few homes. In the 1540s, a Dutch traveller visited Istanbul in search of Byzantine monuments. When he noticed residents pulling water out of their floors, they directed him to a staircase that led into the reservoir. He explored it using a small boat, took measurements, and published his findings in a book that piqued more Western interest in the cistern.

There were repeated renovations in the 1700s – early 1900s to reinforce various part of the structure, and it wasn’t until a major 1985 restoration that the complete scale of the cistern was discovered. After removing 50,000 tons of mud (and probably trash and bodies and who knows what else), the full height of the columns was visible.


You can see that the column capital (the thing at the top) on the closer column is different from the column behind it

The columns are all made of different materials and are of different architectural styles because, in classic ancient fashion, they were swiped from other structures. They always say that it was from ruined structures, but I like to imagine that there was a big column-pilfering problem in ancient times and sometimes people would wake up in the morning to discover that the columns on the local temple were gone… and then they would go steal some others and so on until someone finally sucked it up and just made some new ones. Estimates are that it took 7,000 slaves to construct the cistern, and that doesn’t even include the workforce required to build the 12-mile long aqueduct that fed it.


Check out those ceilings!

Tear column

There are three columns of particular interest. One is carved with the images of eyes and tears, paying tribute to the hundreds of slaves who died during construction. (It’s a good reminder that all of this amazing ancient stuff usually came at a high human cost.) The other two are normal columns, but the bases are two big Medusa heads that scholars think came from the Temple of Apollo near Ephesus (another city in Turkey), but no one knows for sure. One is sideways and one is upside down, a configuration explained by scholars as showing the change from pagan religion to Christianity. Other legends say that they were placed there for protection and are oriented that way to keep them from turning people to stone. I think that they were just so tired of moving them that they said, “This is close enough, we’ll leave them like this.”


Hey, Medusa
The girl who took this for me definitely thought I was a weirdo
Upside down selfie!
First view when walking down the stairs

Now, there are walkways for tourists to tour the cistern, unfortunately replacing the boats that were formerly used. That would have been awesome.

As I took the steps underground, my jaw literally dropped when I got my first look. It’s huge. I know, like duh it’s huge, but when you see it in person and realize that you’re underground, it’s unbelievable! And it was chilly down there which I suppose would have been nice if it wasn’t also chilly outside. My brain couldn’t even imagine the whole thing filled with water, and with no lights down there it would have been CREEEEEPY. Eek. Imagine going in there while it was full, with no clue what you were going to find in a little boat in the darkness with just a lantern. No, thank you. It probably smelled weird too.


I’m obsessed with this brick work

Anyway, despite the fact that I didn’t get to ride on a boat, it was spectacular. The space seems to go on forever, and when you think about the logistics that went into actually constructing it, it’s mind-blowing. All of that. Underground. Over 300 huge columns. So. Many. Bricks. And the ceilings are super high which means they had some sort of scaffolding. And then the aqueducts to feed it! Geez!

After wandering around much longer than anyone else and in a constant state of marveling, I made my way to the exit. Then, if you aren’t already aware of the expanse of the thing by the time you leave, you pop up on the surface, blocks away from the entrance. And it’s bright outside and noisy and bustling and you’re like, “WHAT IS HAPPENING?” because you just emerged from this underground cave and now you’re in the middle of the city. The whole transition was very confusing, and I felt like a time traveler or something.

In conclusion, the Basilica Cistern is super cool, and if you’ve ever wanted to feel like a time traveler, it’s the place for you. Except now that I’ve warned you, maybe you’ll just go and not feel it and think that I’m insane. Maybe I am.

You might be wondering how my Architecture, AutoCAD, and Laser Cutter class ended up going. It wrapped up about a week ago, and things didn’t quite go according to plan. I’m sure you’re shocked. I’m also going to maintain the claim that none of it was my fault, but I guess you can decide that for yourself.

Last time I talked about this class, I’m pretty sure I was recounting the saga of getting AutoCAD installed on the computers. Like I said, the program finally got installed, and I had my first software teaching experience. That all went well, at least in my opinion. I spent about 4 classes teaching different commands in the program.

Basically, I made a list of all of the things that I thought they should know how to do, and then I tried to put them into an order that made sense. I consulted some online AutoCAD tutorials, but there was a lot that I just made up on my own. Before each class, I would go into the lab and draw up practice exercises for each of the different commands. I tried to make things that would challenge the students who were catching on quickly but still be doable for the students who were a bit slower. That’s hard though! It never got easier, but there wasn’t much I could do about it. I refused to move on unless everyone understood what was happening because I’ve been on the other end of this. There’s nothing worse than getting lost on something and then never being able to catch up because the teacher just keeps going.

After my four classes of instruction, I gave them a mini-project to design a house. I said that it needed to have 2 bedrooms, a living room, a kitchen, and a bathroom, but everything else was up to them. I really just wanted everyone to practice drawing, use the different commands I taught them, and be a little creative. Some of the students came up with some amazing designs. Some of the students came up with less amazing ones, but I know that they tried hard on the assignment. It was a very good way to see what level everyone was on. I also made them give little presentations about their houses. That was a mess and a half because no one wanted to present, but I forced them all to get up and say something about their houses anyway. Presentations are a part of life, and if you don’t practice giving them, you’re never going to be comfortable in front of a group!

One of the house designs. He said that he needed a lot of rooms because he has a lot of friends who are going to come and visit him.

The last week of the class was supposed to be laser cutting. I was going to have each of them design the exterior of a little house, use the laser cutter to cut out the pieces, and glue them together into a model. We got all the way to the week before the laser cutting portion of the class, and I still didn’t know how to use the laser cutter. I mean, I had an idea. I read the manual, did some googling, and asked Debbie (my architect friend from Peru) for some tips.

With no time left to space, Carineh (my friend who also worked at GTC and speaks Armenian) and I made plans with the guy at GTC who knows how to use the laser cutter to come in on the Friday before my last Monday class so that he could teach us. We asked the day before if he was free to meet sometime before noon, and he said that we could just call him when we were ready and he’d be there in 30 minutes. Okay, great… until we called at 10 and he was asleep, 11 and he said he was “waiting for something”, and 1 and he said that the workshop coordinator was supposed to talk to us. Huh?

I checked my email, and about 5 seconds earlier, I had gotten an email from her saying that we couldn’t use the laser cutter because we didn’t have approval to use it until October… which makes no sense because my class ended in August. We went to talk to her, and she said that we needed approval from the director,  she was on vacation, and we wouldn’t be able to get an answer until the end of the day. That wasn’t going to work. Even if we did get approval, when was I going to learn how to use it? Carineh asked why they hadn’t requested approval two months ago when they decided that I should use the laser cutter in my class, and her question was met with a blank stare. Wonderful.

This is one of the activities I drew up for the students to do during the final class.

Here’s the most ridiculous thing about the whole laser cutter story… I was literally sent to Gyumri because of the laser cutter. Originally, I was supposed to be placed in the technology center in Vanadzor, the third biggest city in Armenia (which means not very big). I talked to a woman who works for the organization that is responsible for the technology centers, and after we discussed some ideas for my class, she decided that I should use the laser cutter (even though I told her I had no clue how to use it), and that meant I had to be in Gyumri. She talked to Birthright, and my location was switched. Literally because of the laser cutter.

I decided to cancel that portion of the class because it just didn’t make sense to try to do it, and I didn’t need to be stressing myself out unnecessarily about another thing. Instead, we spent the last week doing more AutoCAD practice. I found some exercises online and also drew some things myself when there was nothing that I liked.

It actually went much better than I thought it would, and it was good because the students who were super fast workers actually had to spend the entire class working in order to finish the assignment. Perfect!

A mash up of the GTC staff and volunteers.

I can’t say that I was upset at all when the last class ended. This thing has been such a mess since the very beginning, and it took so much time outside of work to get all of my prep work finished. It was definitely a good experience to have. I hope that I never have to teach through a translator again (especially not while teaching computer software!), but I feel like now that I’ve taught it in that context, it could be fun to teach it in a normal class if the opportunity ever arises.

When I was talking to the jobsite coordinators for Yerevan about what job I wanted to have after moving to Yerevan, my only requirements were that I wanted to work for an NGO, I didn’t want to teach, and I didn’t want to deal with children. I need a break after this whole ordeal.

This has been a crazy week! It was one of those ones that simultaneously feels like a lifetime and a split second. It started out on a rough note… Last Thursday was our last class doing pre-activities before starting AutoCAD, so I wanted to check out the program after class to make sure that it was in English like they told me. That turned out to be the least of my worries because the program wasn’t even installed! On any computer! Maybe I should be blamed for not checking sooner, but I thought that considering 1) I was literally brought to Gyumri to teach AutoCAD and 2) when I asked how many computers had it and what language it was in, I got answers to both questions, it was safe to assume that the program was installed. Wrong.

I have no relevant pictures, so instead, you can enjoy a random selection of wildflowers and this nice sunset picture of Gyumri’s main square.

This was probably my first T.I.A. moment in reference to Armenia (for anyone who wasn’t around for Ghana, T.I.A. – This Is Africa – became our mantra anytime something happened that our foreign minds were unable to comprehend. Having that mindset makes it much easier to just accept it, regardless of how seemingly ridiculous, and move on). So here we are, the new T.I.A. This Is Armenia, aka I shouldn’t have assumed anything even though in my mind, that was a natural conclusion to draw.

I immediately told the workshop coordinator, and she seemed shocked. That was comforting… not. She assured me that it could be installed by Monday’s class, but with my expectations shattered, I didn’t let myself believe her. Since I only work at GTC on Mondays and Thursdays, I wasn’t going to be there again before class. I asked if she could send me a message when the job was finished so that I didn’t have to worry… guesses, anyone, about whether or not I actually expected to get a message? Correct, the answer is no, I didn’t expect to, and no, I didn’t receive one.

I sent follow ups on Saturday and Sunday and was assured that they would be ready in time… until Sunday at about 7:30PM when I got the “there’s an issue, it’s not going to be ready for tomorrow” message. Ah. At last. I made the call to cancel class because there was no time to prep something new for Monday, and even there was, we would have just been killing time.

Thanks to one very helpful and hardworking person at GTC, the computers WERE ready for Thursday, and AutoCAD WAS in English. Phew. So my class turned into a combined English/AutoCAD class as I taught everyone the English words for the different commands and other relevant words. It was interesting. I feel like no matter where I am, I’m teaching everything for the first time the absolute HARDEST way. In Peru, yeah, let’s teach kids about robots in Spanish. In India, sure, let’s teach Shakespeare to kids who are at a 4th grade reading level. In Armenia, perfect, let’s teach AutoCAD in English to people who only speak Armenian. On the bright side, if I ever do any of these things again, they literally can only get easier. I’m sure of that.

It actually went fairly well today which was encouraging. There’s a huge abilities gap in the class though, so some people catch onto things really quickly, and others have to be walked through every step. It’s going to be a challenge to keep everyone busy and challenged, but all I can do is my best. That’s just the way computer program classes are, and if you’re one of the fast people, you need to either find some ways to entertain yourself or help the slow ones.

My amusement of the week has been discovering the Armenian way of pronouncing English words. For example, I was helping my friend Carineh (Cah-ree-neh) out by buying some Twix bars for her class. I went into a little store near GTC, and the shopkeeper asked if I needed any help. Normally, I’d say no and just suffer through trying to find what I wanted, but I decided that the evil of trying to speak Armenian was less than the evil of poking around the tiny shop while being stared down.

Me: “Twix oonek?” (Do you have Twix? with Twix pronounced the English way)

Shopkeeper: “Huh??”

Me: “Twix?… Tweeks?… Tweeeks??… Tveeks???”

Shopkeeper: “Ah! Tveeks! Ayo?” (Yes? – She points to a normal size Twix bar.)

Me (relieved): “Ayo! Vetz.” (Yes! Six. – My attempt to tell her I needed six of them.)

Shopkeeper: “Medz?” (Big? – She points to a bigger Twix bar.)

Me (ready for this to be over): “Che, vetz.” (No, six. – Also holding up six fingers because obviously words aren’t working.)

Shopkeeper: “Ah. Vetz.”

She goes and gets six Twix bars and rings me up. Success in the slowest way possible.

This was not the first time that pronunciation completely eliminated our chances of being understood. My first week, we were trying to confirm that GTC has a laser cutter, so Carineh asked one of the guys who works there if he knew where the laser cutter was. She said it all in Armenian except for “laser cutter”, and he just blank stared at her until she said it a few more times with different emphases. Finally, we got an Armenian, “ah! You mean the lah-zer cooter!” Right. That’s exactly what we meant.

This week, I was explaining in Lar-menian (that’s what I’ve started calling the horrible Armenian I speak) what I teach at GTC, and I said “I teach a class on architecture (I said this in Armenian) and AutoCAD (not in Armenian because there’s no translation, except apparently pronunciation-wise)”. Again, blank stares from people who definitely know what AutoCAD is.

“AutoCAD?… Ow-toe-cad?… Ow-toe-cahd??”

Finally, a response, “OH! Ahv-toe-cahd!” But of course. How did I not see the “v” in AutoCAD? Silly me! Carineh said that’s probably because the Armenian word for “automatic” is “av-toe-maht” which makes sense, but at the time I was thinking “WHAT THE HECK??”

As a result of all of this, my current favorite thing is saying English words with a heavy Armenian accent whenever I don’t know the Armenian word. The best is that sometimes, I’m actually right because there either isn’t an Armenian word for it or they use the Russian word which sometimes sounds like the English word. Candy names are the most fun though: “Keet-kaht”, “Sneekers”, “Muh yev muh” (M and M), “Skeet-ulz”. I could keep going, but I’ll spare you for now.

 

I have a new project to work on! Since we’re off school today, Pastor Daniel took me to the Bible college in the morning to check out the construction work they’re doing. There are four buildings on the campus, and they’re currently adding a second floor onto one of them. The first floor is a big assembly hall, and now the second floor is going to have a conference room and some classrooms.

Work in progress… the part I’m supposed to be designing would be on the top of this building.

My task is to make a plan for the third floor. One of the ways they’re considering using the space is by creating mini-apartments that can be rented out to people who are travelling to Bhutan. Since we’re right on the border, hotels and short-term housing are in high demand, and this could be an easy way to generate some revenue for the school and the ministry.

That means I get to play architect again! I’ll probably give some lighting recommendations too, but I’m sure they’ll do whatever they were going to do anyway. I think it’s funny that whenever I say I’m an architectural engineer, it’s like people get bored and stop listening after I say the “architect” part.

Me: I’m an architectural engineer.

Person: Oh, you’re an architect!

Me: Well… not really. I’m an engineer specializing in lighting and electrical systems in buildings.

Person: Oh, you’re an architect!

Me: Yes.

The construction site. Not quite what you’d see in the States, but this definitely isn’t the States so it’s about what I expected. Watch your step!

Luckily, we did take some architecture classes, so I usually know enough to be able to satisfy whatever thoughts they have about what I can do. Plus, I DO have a minor in Architecture which is basically the same thing as a bachelor’s, right? (By the way, the answer to that is no, not even close.) Anyway, usually I’m fine. This task, for example, is simple. It’s not like they’re asking me to design the structure or anything (which is something that everyone assumes an architect can do on the spot… but like, there are structural engineers for that). I don’t have to tell them how to build it. The local builders know, much better than I do, how to build things here. What they want from me is more like the solution to a puzzle or a logic problem than a true architectural question: fit as many comfortably sized rooms as possible in this predetermined space.

 

Roof with a view! These roofs are my blank canvas. Imagine the possibilities!

Once again, I’m comforted by knowing what the alternative to me doing this would be. Like in the school, the alternative to me being the English Lit teacher was no one being the English Lit teacher. Here, the alternative to me designing the layout is someone with literally zero training just making something up. I can at least do better than that.

 

*Note: I know the title is dumb, but I think it’s funny so that’s all that matters.